Friday, September 26, 2014

A Light At The End Of The Tunnel

It wasn't easy to endure but the first layer of black top has finally been put down!



The sidewalks need to be repaired, curbing to be installed, sewer and water covers installed and raised before the second and final layer is laid.  They're been making slow progress but we'll take whatever progress comes at this point.  However, can't wait till it's all done, along with the noise and disruptions.

Just in time for the snow plows to come barreling through and tear it all up again.

No comments: