More progress was made at the ole homestead yesterday!
Things have dried out mostly and what hasn't dried is now frozen! This allowed our contractor to finally get back onsite and the made progress by digging the water line trench from the meter all the way and up to the house, some 600 feet!
You can see the back tread of the tractor sitting on the front right footer for the house -
Looking from the house location down towards the frozen pond with driveway on the right -
Looking up towards the house location, next to the frozen pond -
I was a bit surprised to see how much dirt was dug and piled along the way but VERY pleased with the progress! Now if we could just get Yurezz to schedule the house delivery, GRRR
Progress is progress!